Reno, NV Zoning

32 districts. 4 overlays.
This profile is an earlier edition — some fields may be incomplete. An updated profile is in progress.

Overview

Worth knowing
  • Density-Encoded District Names. Reno's residential districts encode maximum allowed density (du/ac) in the district name (SF-3 = 3 du/ac, SF-5 = 5 du/ac, MF-30 = 30 du/ac). LLR districts encode minimum lot size in acres. This makes the density ceiling immediately readable from the name.
  • Dramatic Front Setback Difference Between SF-3 and SF-5. SF-5 front setback is 10 ft while SF-3 is 30 ft — a 20-ft difference for only 2 du/ac density increase. Flagged in Mercatus Center 2024 policy brief as arbitrary-seeming with no clear health/safety basis.
  • Street-Facing Garage Setback Always Minimum 20-30 ft. All residential districts require garage face setback ≥20-30 ft from sidewalk or planned sidewalk, separate from and more restrictive than principal building setback. SF-5 principal is 10 ft but garage is 20 ft minimum.

+ 3 more in Quirks & notes

Districts

res_sf 7cbd 6spec 5mu 4res_mf 3ind 3com 2off 1ap 1
CodeNameCategory Min lotHeight CoverageFAR Du/acParking Setbacks F/S/R
LLR-2.5Large Lot Residential — 2.5 acres_sf45 ft0.430 / 15 / 30
LLR-1Large Lot Residential — 1 acres_sf45 ft130 / 12 / 30
LLR-0.5Large Lot Residential — 0.5 acres_sf45 ft230 / 10 / 30
SF-3Single-Family — 3 du/acres_sf35 ft330 / 5 / 30
SF-5Single-Family — 5 du/acres_sf35 ft510 / 5 / 20
SF-8Single-Family — 8 du/acres_sf8 / /
SF-11Single-Family — 11 du/acres_sf11 / /
MF-14Multi-Family — 14 du/acres_mf14 / /
MF-21Multi-Family — 21 du/acres_mf21 / /
MF-30Multi-Family — 30 du/acres_mf30 / /
MD-EDDowntown Entertainmentcbd / /
MD-IDDowntown Innovationcbd / /
MD-NWQDowntown NW Quadrantcbd / /
MD-RDDowntown Riverwalkcbd / /
MD-UDDowntown Universitycbd / /
MD-PDDowntown Powningcbd / /
MUMixed-Use Urbanmu / /
MSMixed-Use Suburbanmu / /
GCGeneral Commercialcom / /
NCNeighborhood Commercialcom / /
POProfessional Officeoff / /
MU-MCMixed-Use Midtown Commercialmu / /
MU-RESMixed-Use Midtown Residentialmu / /
IIndustrialind / /
ICIndustrial Commercialind / /
MEMixed Employmentind / /
MAMixed-Use Airportap / /
PGOSParks, Greenways, Open Spacespec / /
PFPublic Facilitiesspec / /
UT5Unincorporated Transition — 5 acspec / /
UT10Unincorporated Transition — 10 acspec / /
UT40Unincorporated Transition — 40 acspec / /

Confidence: confirmed partial under review not found

Overlays

Gaming
Gaming
GED
§18.02 Table 2-1, Article 6

General Commercial (GC) or Suburban Mixed-Use (SMU) base districts where gaming has been approved (business license, building permit, conditional use permit)

descriptionPermits gaming-enterprise-scale commercial activities on qualifying sites; coordinates with Nevada gaming licensing law (NRS 463)
noteGaming overlay shall not be assigned where non-restricted gaming has not been approved
TR
TR
MH
Article 6, §18.02 Table 2-2

Manufactured home park areas (as mapped)

descriptionModifies base district to accommodate manufactured home parks
SPD
SPD
SPD
§18.02.506

Properties subject to specific plan approval

descriptionFlexible development overlay for specific plan districts
PD
PD
PD
§18.02.507

Properties subject to planned development approval

descriptionFlexible development overlay for planned developments

Adopted building codes

Statewide w/ local amendments

Local adoption
2024
2023
Local
IECC (Residential)
2024
IECC (Commercial)
2024

Click a code label to open its state-by-state adoption atlas.

Quirks & notes

  • Density-Encoded District Names. Reno's residential districts encode maximum allowed density (du/ac) in the district name (SF-3 = 3 du/ac, SF-5 = 5 du/ac, MF-30 = 30 du/ac). LLR districts encode minimum lot size in acres. This makes the density ceiling immediately readable from the name.
  • Dramatic Front Setback Difference Between SF-3 and SF-5. SF-5 front setback is 10 ft while SF-3 is 30 ft — a 20-ft difference for only 2 du/ac density increase. Flagged in Mercatus Center 2024 policy brief as arbitrary-seeming with no clear health/safety basis.
  • Street-Facing Garage Setback Always Minimum 20-30 ft. All residential districts require garage face setback ≥20-30 ft from sidewalk or planned sidewalk, separate from and more restrictive than principal building setback. SF-5 principal is 10 ft but garage is 20 ft minimum.
  • MF-30 Lot Width Analysis. Code appears to allow two SFD homes on 50-ft-wide lot in MF-30, implying minimum lot width ≤50 ft and ~25 ft/dwelling. District intended for high-density apartments but allows very dense single-family patterns.
  • ADU Ordinance Adopted October 2025. Reno adopted formal ADU ordinance with 5,000 sf minimum lot requirement (beyond state law AB 396). ADUs must be smaller than primary residence and located behind it — design constraints not in state law.
  • Code Update July 2024. ALDC (Annexation and Land Development Code) was updated effective July 24, 2024. Research file used Jan. 13, 2021 version. Dimensional standards extracted may have been modified.

Formulas

Definitions

density
note: SF-3 = 3 du/ac; SF-5 = 5 du/ac; MF-30 = 30 du/ac; LLR districts encode minimum lot size in acres
lot_coverage
note: SF-5 alternative: 40% of lot or common open space = 20% of gross project area
parking_garage_setback
note: SF-3: 30 ft; SF-5: 20 ft principal, 30 ft accessory; alley properties: 0 ft if ≥24 ft backup space

Massing explorer

Interactive 3D comparison across every district. Drag to orbit, scroll to zoom, use the slider to walk districts, and toggle applicable overlays in the right-side panel.

Sort by
LOW
HIGH
drag to orbit · scroll to zoom
Max height
ft
Floor area ratio
Lot coverage
%
Setbacks (F / S / R)
ft
Parking
/unit
Max density
du/ac
Min lot size
sf
Copy zoning profile
Loading…
District Category Height FAR Coverage Setbacks Parking Density Min lot Overlays

Research status

Data quality

Documented gaps
  • SF-8, SF-11, MF-14, MF-21, MF-30 dimensional standards (height, lot size, coverage, setbacks, parking)
  • MU, MS, downtown MD districts height/FAR/parking standards
  • GC, NC, PO, MU-MC, MU-RES dimensional standards
  • I, IC, ME, MA dimensional standards
  • Detailed design guidelines for downtown MD districts
  • Current ADU ordinance text (Oct. 2025 adoption)

Known issues

schema:v1-legacypriority:lowdata:gaps-present

Other cities in this state

Nearest-alphabetical profiles. Click through to compare zoning patterns side-by-side.