NC Sedimentation Pollution Control Act of 1973 (G.S. 113A Article 4) (NC)

Tracked preemption from the North Carolina overlay bundle.

Overview

Effective
1973-07-04
Sunset
Authority
state
Scope
state:NC

Trigger predicate

When this evaluates true for a parcel, the law's preempted fields take precedence over base zoning.

AND
  • project.land_disturbance_acres 1

Preempted fields

4 fields on the base district schema are rewritten when the trigger fires.

FieldOpValueNote
review_typerequireapproved_erosion_sedimentation_control_planLand-disturbing activities >1 acre on a tract must file an E&SC plan ≥30 days before initiating; plan approved by NC DEQ Land Quality Section or delegated local program
base_districts[*].riparian_buffer_ftfloor_at25Trout waters: undisturbed 25-ft buffer minimum; otherwise buffer of sufficient width to confine visible siltation within 25% of buffer nearest disturbance
base_districts[*].slope_stabilization_requiredrequireground_cover_within_14_days_or_design_storm_basinGround cover within 14 working days (21 calendar days) after completion of grading; design storm sedimentation basin sized per Erosion and Sediment Control Planning and Design Manual
permit_review.applicable_authorityoverridedelegated_local_program_or_NC_DEQ_LQS

Citation

Authority source
N.C.G.S. Chapter 113A, Article 4 (Sedimentation Pollution Control Act of 1973); 15A NCAC 04
§ §113A-50 – §113A-66
https://www.ncleg.gov/EnactedLegislation/Statutes/HTML/ByArticle/Chapter_113A/Article_4.html

Research notes

Statewide minimum erosion and sediment control. Administered by NC Sedimentation Control Commission; implemented by NC DEQ Division of Energy, Mineral, and Land Resources (DEMLR) Land Quality Section. Cities and counties may run delegated local programs (≈60 jurisdictions including Raleigh, Charlotte, Mecklenburg, Wake, Durham, Greensboro, Winston-Salem, Asheville, Wilmington). Delegated programs may be more stringent than state minimum. Trout waters (Western NC: Avery, Watauga, Ashe, Alleghany, etc.) get 25-ft undisturbed buffer. Coordinates with NPDES Construction Stormwater General Permit (NCG010000). Penalties up to $5,000/day per violation. Distinct from §143-214.5 watershed protection but commonly stacked.