Indiana Code 14-28 — Floodway / Flood Control Construction Permits (IDNR Division of Water) (IN)

Tracked preemption from the Indiana overlay bundle.

Overview

Effective
1995-07-01
Sunset
Authority
state
Scope
state:IN

Trigger predicate

When this evaluates true for a parcel, the law's preempted fields take precedence over base zoning.

parcel.geometry geographic match

Preempted fields

3 fields on the base district schema are rewritten when the trigger fires.

FieldOpValueNote
review_typerequireIDNR_Construction_in_Floodway_permitAny structure, obstruction, deposit, or excavation in a floodway requires written application + IDNR Director permit; minimum $200 non-refundable fee.
permit.validity_yearscap_at5Permit valid 5 years from issuance; expires if construction is not commenced within 2 years.
base_districts[*].floodway_construction_findingsrequireno_adverse_capacity_safety_or_resource_impactDirector must find that the work will not adversely affect floodway capacity, constitute hazard to life/property, or unreasonably harm fish/wildlife/botanical resources.

Citation

Authority source
Ind. Code § 14-28-1 (Flood Control Act); operative permit standard at § 14-28-1-22
§ §14-28-1-22 (construction permits, fees, exceptions)
https://iga.in.gov/laws/2025/ic/titles/14#14-28

Research notes

Per-parcel geographic predicate; the binding overlay is the IDNR-mapped floodway. Federal conflict check flagged: floodway permits coexist with FEMA NFIP floodplain regulations (44 CFR Part 60) and may intersect Army Corps Section 404 (Clean Water Act) authority on adjacent waters. Forestry-BMP and logjam-removal exemptions per Indiana Logging and Forestry BMPs.