POST 073 · CROSS-DOMAIN BINDING

Construction documents are build artifacts.

Click "Build." Watch the AEC process unfold realistically — 16 weeks of coordination chaos, RFIs, revisions, errors that persist. Or switch to Compiled mode and watch it generate 127 sheets in 1.4 seconds with zero errors. Same building, different authoring paradigms.
Progress 0%
Errors accumulated 0
Billable hours 0 hrs
Cost @ $180/hr $0
Compiled cost $0 (marginal)
Build time
Sheets generated
Errors
Unresolved
Nobody hand-writes assembly. Nobody should hand-draw construction documents. The CD set is a build artifact — deterministic, reproducible, generated from the model.