Feasibility Is the Real Design Phase
click any phase. see leverage vs. fee captured. — OnlyPlans applet #63
Design leverage by phase (decisions still open)
Leverage in the selected phase
70%
of total design shape still available
Fee captured here
8%
of total architectural fee
Feasibility: you hold 70% of the building's shape, and the profession pays you 8% of the fee to hold it.