POST 055 · CROSS-DOMAIN BINDING

Every building is a supply chain problem.

Hit play. Watch materials flow (or stall). Introduce a disruption and watch the cascade. A building isn't designed, then built — it's a logistics pipeline with serial dependencies.
Wk 0
construction timeline · 52 week scheduleon schedule
Current phase
Days behind
0
Cost overrun
$0
Idle crews
0
The Gantt chart is a dependency graph. Pull one thread and everything downstream cascades. AEC pretends these are independent tasks — supply chains know better.