Your site plan is actually a stormwater plan.

Choose a detention strategy. Adjust storm intensity and site area. The site plan redraws — detention eats buildable area. The building lives in what the water left.
Site plan · 2.4 acres
Detention strategy
Stormwater → Yield impact
Buildable area
Detention SF
Max units
Added cost
The detention goes first. The building pad is what's left. The civil engineer draws the real site plan — the architect fits into it.