Apr 5, 2026 — Clifton

Portals II

A door schedule is a database. Every door is a row — type, size, hardware, fire rating, ADA compliance, swing clearance. This is what the schedule looks like when the drawing and the data are the same object. Plan views show swing angles at 15°, 45°, and 90°.

Purpose: the angle of attack matters as much as the door width. A 36" door that swings into a corridor without clearance is a code violation and a hazard. The arc tells the story.
Door Schedule
MarkTypeSizeFireHardwareADA
Multifamily's Problem Child →The Future of Generative Design is not Dynamo →Our Commitment to Architects & Co-Creation →
↗ Read the essayPortal II →